Thank you to all residents in the Carleton Heights community who were able to attend the public information session for the Claymor Avenue, Senio Avenue and Falaise Road Integrated Road, Sewer and Watermain Replacement Project.
The engineering firm, Robinson Consultants, has been retained by the City of Ottawa to develop design drawings for this project.
The objective of this project is to rehabilitate underground and roadway infrastructure that is nearing the end of its lifespan.
Watermain, sewer and roadway infrastructure will be rebuilt, including widening of the road for Claymor Avenue and Senio Avenue. On Claymor Avenue, curbs will be installed and the east sidewalk will be rebuilt.
Construction is planned to start late spring 2020 and be completed by the summer of 2021.
The project limits are Claymor Avenue (Meadowlands Drive to Falaise Road), Senio Avenue (Normandy Crescent to Falaise Road) and Falaise Road (Claymor Avenue to Prince of Wales Drive).